← Back to Virtual Labs|Radiation Detection, Shielding, and Industrial Source Safety
Nuclear Engineering Technology · Industrial Radiation Applications

Radiation Detection, Shielding, and Industrial Source Safety

Work as the radiation protection technician at a manufacturing plant. Check a Geiger-Müller counting system, apply counting statistics, and measure how distance and shielding control alpha, beta, and gamma radiation. Then put the physics to work on two real industrial jobs: inspecting aluminum foil with a beta thickness gauge, and roping off the public boundary for an Ir-192 weld radiography job. Two graph work areas then plan the radiography job the way a radiation safety officer does: a plot of dose rate against distance to set the rope with and without the collimator, and a decay curve to correct the Ir-192 source activity and exposure time on the job date. In every part you work out the answer yourself, then check it.

Theory: Radiation Detection, Shielding, and Industrial Sources

Where You Will Meet Radiation at Work

Sealed radioactive sources are everyday tools in industry. Fixed gauges measure the thickness of steel, aluminum foil, paper, and plastic film on production lines, the fill level of cans and tanks, and the density of soil and asphalt. Industrial radiography uses intense gamma sources to inspect welds in pipelines, pressure vessels, and aircraft parts without cutting them open. Nuclear power plants, hospitals, and research reactors all employ radiation protection technicians who check detectors, survey work areas, and set up boundaries. In this lab you work as a technician at a manufacturing plant: you check a detector, characterize a source, design shielding, run a production-line thickness gauge, and set the safety boundary for a radiography job.

Types of Ionizing Radiation

Unstable nuclei decay by emitting radiation. The three common types differ greatly in how far they travel through matter.

RadiationWhat it isExample sourceStopped by
Alpha (α)Helium nucleus, charge +2, heavyAm-241 (5.49 MeV)A sheet of paper, or about 4 cm of air
Beta (β⁻)Fast electron from the nucleusSr-90/Y-90 (2.28 MeV maximum)A few millimetres of aluminum or plastic
Gamma (γ)High-energy photon, no chargeCs-137 (662 keV), Ir-192 (about 380 keV average)Never stopped completely; reduced exponentially by dense materials such as lead

Activity and Decay

The activity of a source is the number of decays per second, measured in becquerels (1 Bq = 1 decay/s). Industry still often uses the curie (1 Ci = 3.7 × 10¹⁰ Bq = 37 GBq). Activity falls with time as A = A₀e^(−λt), where λ = ln 2 / t½. Gauges are recalibrated regularly because their sources slowly decay: Cs-137 has a half-life of 30.1 years, Sr-90 28.8 years, and Ir-192 only 73.8 days, which is why radiography sources must be replaced several times a year.

The Geiger-Müller Detector

A Geiger-Müller (GM) tube is a gas-filled tube with a thin central wire held at several hundred volts. Radiation that enters ionizes the gas, and the freed electrons accelerate toward the wire, creating an avalanche that produces one electrical pulse. A scaler counts the pulses. The tube is operated on its plateau, the voltage range where the count rate barely changes with voltage. After each pulse the tube is "dead" for roughly 100 μs, so at very high count rates some events are lost (dead time). A GM tube counts events but cannot measure their energy.

Counting Statistics

Radioactive decay is random, so repeated counts scatter. Counts follow a Poisson distribution, and the standard deviation of a count N is simply its square root. A larger count gives a smaller relative uncertainty, which is why technicians count longer for precise work. Every measurement includes background radiation from the surroundings, which must be measured separately and subtracted.

Counting Statistics σ_N = √N     relative uncertainty = √N / N = 1/√N
Count rate R = N / t (counts per second, cps)
Net rate R_net = N_gross / t_gross − N_bkg / t_bkg
σ(R_net) = √( N_gross / t_gross² + N_bkg / t_bkg² )
Quadrupling the counting time halves the relative uncertainty

Distance: the Inverse-Square Law

Radiation from a small (point) source spreads out over the surface of a sphere, so its intensity falls with the square of the distance. Doubling your distance from a source cuts the dose rate to one quarter. Distance is the cheapest and most powerful protection a worker has. The law holds well once the distance is several times larger than the source and the detector window; very close to the detector it breaks down.

Inverse-Square Law I₂ = I₁ (r₁ / r₂)²
Double the distance → one quarter of the intensity

Shielding: Exponential Attenuation and the Half-Value Layer

A narrow beam of gamma rays passing through an absorber of thickness x is reduced exponentially. The linear attenuation coefficient μ depends on the photon energy and the material, and is largest for dense, high atomic number materials such as lead and tungsten. The half-value layer (HVL) is the thickness that cuts the intensity in half. Beta particles from a source with a spread of energies are also absorbed in an approximately exponential way over thin absorbers, which is the principle of the beta thickness gauge.

Attenuation I = I₀ e^(−μx)     HVL = ln 2 / μ = 0.693 / μ
Solving for thickness: x = ln(I₀ / I) / μ
Mass attenuation coefficient: μ/ρ (cm²/g), so μ = (μ/ρ) × ρ
Each HVL halves the intensity: n HVLs leave (1/2)ⁿ
Radiation and absorberValue used in this labNotes
Cs-137 γ (662 keV) in leadμ = 1.25 cm⁻¹, HVL ≈ 0.55 cmNarrow-beam value
Cs-137 γ in aluminumμ = 0.20 cm⁻¹Light metals shield gamma poorly
Sr-90/Y-90 β in aluminumμ/ρ = 6.6 cm²/g, μ = 17.8 cm⁻¹ (ρ = 2.70 g/cm³)Basis of the foil thickness gauge
Ir-192 γ in leadHVL = 0.48 cmPractical value for radiography shielding

Dose Rate, Limits, and Radiography Boundaries

Biological effect is described by dose in sieverts (Sv). For a gamma point source, the dose rate at distance r is found from the source's dose-rate constant Γ. In the United States, the occupational limit is 50 mSv per year, and an area where a person could receive more than 0.02 mSv (20 μSv) in any one hour must be controlled. During radiography, the crew ropes off a boundary where the dose rate falls to 20 μSv/h and posts warning signs. Every exposure is also kept As Low As Reasonably Achievable (ALARA) using the three tools of time, distance, and shielding.

Gamma Dose Rate from a Point Source Ḋ = Γ A / r² × (1/2)^(x / HVL)
Γ(Ir-192) = 0.13 mSv·m² / (h·GBq), A in GBq, r in m
Boundary radius where Ḋ = 0.020 mSv/h: r = √( Γ A T / 0.020 ), with T = (1/2)^(x / HVL)
Dose received: D = Ḋ × t
Time, distance, and shielding are the three tools of radiation protection

Time

Dose = dose rate × time. Plan the job, rehearse it, and work quickly near the source.

Distance

Dose rate ∝ 1/r². Tongs, remote cranks, and long guide tubes keep hands and bodies far away.

Shielding

Paper for alpha, aluminum or plastic for beta, lead or tungsten for gamma. Each HVL halves the dose rate.

Planning a Radiography Job with Graphs

Radiography crews plan each job before the source leaves its camera. On a log–log plot of dose rate against distance, the inverse-square law is a straight line, so the boundary is simply where that line crosses the 0.020 mSv/h limit; a collimator shifts the whole line down by its transmission. Sources also decay: with a 73.83-day half-life, an Ir-192 source loses about 1% of its activity per day. Crews read the activity on the job date from a decay curve and lengthen the exposure so that activity × time, and so the film exposure, stays the same. Sources are usually exchanged when they fall to a few hundred gigabecquerels, because exposure times become too long.

Apparatus

The equipment a radiation technician uses on this job. In the simulation these are modelled for you, and the readings correspond to what each instrument would show in a real plant.

01205
GM tube and scaler
The thin end window lets beta and gamma (and alpha at close range) enter; the scaler counts pulses over a set time.
Sealed sources in a lead pig
Am-241 (alpha), Sr-90 (beta), and Cs-137 (gamma) check sources, handled only with tongs and stored shielded.
PaperAlPb
Absorber set
Paper sheets, aluminum plates, and lead plates of known thickness for shielding measurements.
Distance rail
Holds the source and the detector on a scale so the separation can be set precisely in centimetres.
Beta thickness gauge
A C-frame with a Sr-90 source below and a detector above; the foil runs through the gap at production speed.
20
Radiography camera and survey meter
A shielded Ir-192 camera cranks the source out through a guide tube to the weld; the survey meter reads dose rate in μSv/h.

Instructions: Running the Virtual Experiment

You are the radiation protection technician at a manufacturing plant. The simulation has three immersive 3D work areas and two graph work areas. The parts build from undergraduate work in Parts A to E to graduate-level analysis in the last step of Parts F and G; the level of each part is shown beside its title. In each one you set up the equipment, take readings, work out the answer yourself, enter it, and press Check. Record every reading and every prediction in your lab report tables, with a labelled screenshot of each setup. Drag in any 3D view to orbit, and scroll to zoom.

Part A: Detector Check and Counting Statistics (3D Counting Bench)Undergraduate
1
Open Simulation → 3D Counting Bench. Select Background only, set the count time to 60 s, and press Count. Repeat until you have three background counts, and record each N in Table A. Repeating shows that radioactive counts vary randomly from one count to the next, and averaging them gives a more reliable background rate. The scaler panel shows the mean background of all your background counts, and this mean is subtracted from every later measurement.
2
Choose Predict: counting uncertainty. Calculate σ = √N for your last count, enter it, and press Check. Then check that your three counts scatter by roughly √N, and calculate the mean background rate in cps.
3
Select Cs-137 at r = 5.0 cm with no absorber, and count for 60 s. Calculate the net count rate and its uncertainty using the counting statistics equations. Compare your net rate with the reference value on the source certificate shown on screen.
Part B: Distance and the Inverse-Square Law (3D Counting Bench)Undergraduate
1
Keep Cs-137 and no absorber. Choose Predict: net count rate. For each distance r = 3, 7, 10, and 15 cm, first predict the net rate using I₂ = I₁(r₁/r₂)² with the certificate value at 5.0 cm, enter it, and press Check.
2
Then press Count (60 s) and compare the measured net rate with your prediction. Record r, predicted rate, gross count, and measured net rate in Table B.
3
Switch to Am-241 (alpha) and move the source from 2 cm to 6 cm. Note the distance at which the count drops to background, and explain this using the range of alpha particles in air.
Part C: Shielding Design (3D Counting Bench)Undergraduate
1
Test each source with one sheet of paper, 3 mm of aluminum, and 5 mm of lead. Use r = 5.0 cm for Sr-90 and Cs-137, but r = 2.0 cm for Am-241, because alpha particles travel only about 4 cm in air. Record in Table C1 whether each radiation passes, and identify which shield stops alpha and which stops beta.
2
Select Cs-137 and lead. For lead thicknesses of 5.5, 11, 16.5, and 22 mm, predict the transmitted net rate with I = I₀e^(−μx), μ = 1.25 cm⁻¹, using Predict: net count rate. Check each, then count and record in Table C2.
3
Choose Predict: half-value layer. Calculate the HVL of lead for Cs-137, enter it in cm, and press Check. Confirm from Table C2 that each 5.5 mm of lead halves the rate.
Part D: Production-Line Thickness Gauge (3D Thickness Gauge)Undergraduate
1
Open 3D Thickness Gauge. The aluminum foil line has a Sr-90 beta gauge. Press Calibrate (no foil) to record the open-gap rate R₀. Record R₀ and the given background rate (0.5 cps) in Table D.
2
Press Run next sheet. Read the gross count rate R through the foil, and subtract the 0.5 cps background from both R and R₀. Calculate the thickness with x = ln(R₀/R)/μ using these net rates, where μ = 17.8 cm⁻¹, and convert to mm. Enter it and press Check thickness.
3
The specification is 0.50 ± 0.05 mm. Decide Accept or Reject and press the button. Inspect at least five sheets, and record R, your calculated thickness, and your decision in Table D.
Part E: Radiography Safety Boundary (3D Radiography Site)Undergraduate
1
Open 3D Radiography Site. A pipe weld will be X-rayed with an Ir-192 source. Set the source activity and any lead shielding at the source. Using Ḋ = ΓA/r² × (1/2)^(x/HVL), with Γ = 0.13 mSv·m²/(h·GBq) and HVL = 0.48 cm, calculate the radius at which the dose rate falls to 0.020 mSv/h.
2
Enter your boundary radius and press Set rope and check. The rope barrier moves to your radius and the survey meter reports the dose rate there. Adjust until your rope sits at the correct boundary.
3
Choose Predict: worker dose. For the radiographer at the stated distance and exposure time, calculate the dose received in mSv, then check. Record the activity, shielding, boundary radius, and worker dose for at least three setups in Table E, and comment on how time, distance, and shielding change the result.
Part F: Planning the Boundary (Graph: Boundary Distance)Upper undergraduateGraduate step
1
Open Graph: Boundary Distance. Choose 1850 GBq and a 9.6 mm collimator. Check the boundary distance with the collimator, then the dose rate at 50 m. Press Record this run.
2
Repeat at 1850 GBq with no collimator, 4.8 mm and 14.4 mm, then at 2960 GBq and 1110 GBq with 9.6 mm. Record every run in Table F.
3
On the graph, note how far the boundary moves for each extra half-value layer. Take a labelled screenshot of one dose-rate graph for your report.
4
GraduateThe narrow-beam half-value layer ignores photons scattered inside the lead that still travel toward the rope. Choose Advanced: collimated boundary with broad-beam build-up and check it for 4.8, 9.6 and 14.4 mm at 1850 GBq, using the build-up factor shown in the Readings. Record the values under Table F and state by how many metres the rope must move out.
Part G: Correcting for Source Decay (Graph: Source Decay)Upper undergraduateGraduate step
1
Open Graph: Source Decay. Choose 1850 GBq and an exposure time of 3.0 min on the calibration date. Set the job date to 120 days. Check the activity on the job date and the exposure time. Press Record this run.
2
Repeat for 0, 30, 74, 180 and 240 days and record each run in Table G. Check the days until the source reaches 370 GBq.
3
Explain in your report why the exposure time must be recalculated on each job date and when the source should be replaced.
4
GraduateDerive the average exposure time per film when films are shot evenly from calibration until the source reaches 370 GBq, by averaging t₀·2^(t/73.83) over that period. Choose Advanced: average exposure time per film and check it for 1850 GBq with t₀ = 3.0 min, then for 2960 GBq. Record the values under Table G and explain what they mean for crew time and dose.

Simulation: Radiation Technician Work Areas and Job-Planning Graphs

Radiation Detection and Shielding Virtual LabSet up the equipment, work out your answer, then Check

A GM tube and scaler sit on a distance rail. Choose a sealed source, set the source-to-detector distance and an absorber, then count. Coloured tracks show the radiation leaving the source: red for alpha, blue for beta, and yellow for gamma. Tracks that end at the absorber were stopped. Parts A, B, and C use this bench.

Drag to orbit · scroll to zoom. 3D counting bench: a GM tube and scaler on a distance rail with a source holder, absorber plate, tongs and a lead storage pig.

Setup

Scaler and certificate

Gross count N—
Count time t—
Gross rate N/t—
Mean background ratenot measured
Net rate—

Work it out, then check

Tables A to C: your counting record
Sourcer (cm)Absorbert (s)Gross Nσ = √NGross rate (cps)Net rate (cps)

An aluminum foil line passes through a C-frame beta gauge: a Sr-90 source below the foil and a detector above it. Thicker foil absorbs more beta particles, so the count rate falls. Calibrate with the gap empty, then inspect each sheet as it arrives. Each reading is a 10 s count. Part D uses this line. Use μ = 17.8 cm⁻¹ for these beta particles in aluminum.

Drag to orbit · scroll to zoom. 3D production line: an aluminum foil conveyor passing through a C-frame beta gauge, with the control cabinet display and pass/fail lamp.

Gauge controls

Specification: 0.50 ± 0.05 mm. Background rate: 0.5 cps.

Gauge display

Open-gap gross rate R₀not calibrated
Sheet number—
Gross rate through sheet R—

Work it out, then check

Table D: your inspection record
SheetR₀ (cps)R (cps)Your x (mm)Measured x (mm)Decision

A pipeline weld is being radiographed in an open yard. The yellow camera cranks the Ir-192 source out through the guide tube to the weld. You must rope off the area where the dose rate exceeds 0.020 mSv/h and check the dose to the radiographer at the crank. Distances in the 3D view are not to scale. Part E uses this site.

Drag to orbit · scroll to zoom. 3D radiography yard: a pipe weld with the Ir-192 source, the yellow camera and guide tube, the radiographer, and the rope barrier with warning posts.

Job setup

Survey meter at the rope

Rope radiusnot set
Dose rate at the rope—
Limit at the boundary0.020 mSv/h

Γ(Ir-192) = 0.13 mSv·m²/(h·GBq); HVL of lead = 0.48 cm.

Work it out, then check

Table E: your radiography record
A (GBq)Lead (mm)Your boundary r (m)Correct r (m)d (m)t (min)Worker dose (mSv)

Before a radiography job the boundary is planned on paper. The dose rate falls with the square of the distance, and a lead collimator around the source cuts it further. Part F uses this work area.

Dose rate against distance from an Ir-192 radiography source (logarithmic axes), bare and with the lead collimator you chose, with the 0.020 mSv/h public boundary line. The dots mark where each line crosses the limit; work out the exact boundary distance and check it.

Show the plotted values

Setup

Readings

Γ for Ir-192—
HVL of lead—
Transmission through collimator—
Public boundary limit—
Build-up factor B in the collimator (training value)—

Dose rate = ΓA·T/r², with T = 0.5^(x/HVL). The boundary is where the dose rate equals 0.020 mSv/h.

Work it out, then check

Table F: your boundary-planning record
A (GBq)Collimator (mm Pb)Boundary, bare (m)Boundary, collimated (m)Dose rate at 50 m (mSv/h)

Ir-192 decays with a 73.83-day half-life, so a source loses about 1% of its activity each day. The exposure time for each film must be increased as the source decays. Part G uses this work area.

Ir-192 source activity against days since the calibration date, with the typical 370 GBq replacement level. The dot is the job date you chose.

Show the plotted values

Setup

Readings

Half-life of Ir-192—
Replacement level—
Activity rule—

A = A₀ × 0.5^(t/73.83 d). Exposure time × activity is kept constant: t = t₀ × A₀/A.

Work it out, then check

Table G: your source-decay record
A₀ (GBq)DaysActivity (GBq)t₀ (min)Exposure time (min)Days to 370 GBq

These immersive 3D work areas and interactive graph work areas are the main version; the accessible copy delivers the same set-up, work-out, and check exercises with native controls and screen-reader announcements.

Team Questions

Question 1. A 60 s background count gives 45 counts. With a Cs-137 source in place, a 60 s count gives 1205 counts. What is the net count rate in cps? (e.g. 19.3)
Question 2. What is the standard deviation σ of the 1205-count gross reading in Question 1? (counts, e.g. 34.7)
Question 3. A gamma source gives a net rate of 200 cps at 4.0 cm. What net rate do you expect at 8.0 cm? (cps)
Question 4. What fraction of Cs-137 gamma rays passes through 1.11 cm of lead, if μ = 1.25 cm⁻¹? (decimal, e.g. 0.25)
Question 5. Which absorber would you choose to stop the beta particles from a Sr-90 gauge source while keeping the shield light and producing little bremsstrahlung: paper, aluminum, or lead?
Question 6. A foil-line beta gauge reads R₀ = 4000 cps with the gap empty and R = 1640 cps through a sheet (background already subtracted). With μ = 17.8 cm⁻¹, what is the sheet thickness in mm? (e.g. 0.50)
Question 7: Challenge. An unshielded 1000 GBq Ir-192 radiography source has Γ = 0.13 mSv·m²/(h·GBq). At what radius must the rope barrier be placed so that the dose rate is 0.020 mSv/h? (m)

Example Lab Report

Sample report showing the expected format and level of detail. Use it as a guide for your own submission, and include labelled screenshots of each setup and reading. Your counts will differ slightly because radioactive decay is random.

Radiation Detection, Shielding, and Industrial Source Safety

Nuclear Engineering Technology | Section: [Your Section] | Date: [Date]

Lab Members: [Names of all members present]

Purpose

To check a Geiger-Müller counting system and apply counting statistics; to verify the inverse-square law and exponential attenuation for gamma radiation; to compare the penetration of alpha, beta, and gamma radiation; and to apply these principles to two industrial tasks: inspecting aluminum foil with a beta thickness gauge, and setting the public dose-rate boundary for an Ir-192 radiography job, including planning the radiography boundary from a dose-rate graph and correcting the source activity and exposure time for decay.

Theory

Counts follow Poisson statistics, so σ = √N. The net rate is the gross rate minus the background rate. A point source obeys I₂ = I₁(r₁/r₂)², and a narrow beam is attenuated as I = I₀e^(−μx), with HVL = 0.693/μ. A beta gauge gives thickness from x = ln(R₀/R)/μ. For radiography, Ḋ = ΓA/r² × (1/2)^(x/HVL), and the boundary is where Ḋ = 0.020 mSv/h.

σ = √N  ·  I₂ = I₁(r₁/r₂)²  ·  I = I₀e^(−μx)  ·  r = √(ΓAT/0.020)

Table A: Background and Counting Statistics (t = 60 s) Undergraduate

CountSourceNσ = √NRate (cps)
1Background285.30.47
2Background335.70.55
3Background295.40.48
4Cs-137 at 5.0 cm483669.580.6

Mean background = 0.50 cps. Net rate = 80.6 − 0.50 = 80.1 ± 1.2 cps, in agreement with the certificate value of 80 cps.

Table B: Inverse-Square Law (Cs-137, no absorber) Undergraduate

r (cm)Predicted net rate (cps)Gross N in 60 sMeasured net rate (cps)
3.022213 391222.7
5.080.0483680.1
7.040.8246540.6
10.020.0122920.0
15.08.95658.9

Sample calculation at 10 cm: 80.0 × (5.0/10.0)² = 20.0 cps. Am-241 alpha counts fell to background beyond about 4 cm, the range of 5.5 MeV alpha particles in air.

Table C1: Penetration (r = 5.0 cm for beta and gamma, 2.0 cm for alpha) Undergraduate

Source1 sheet paper3 mm aluminum5 mm lead
Am-241 (α)StoppedStoppedStopped
Sr-90 (β)Passes (95%)Stopped (0.5%)Stopped
Cs-137 (γ)PassesPasses (94%)Passes (54%)

Table C2: Lead Attenuation of Cs-137 (r = 5.0 cm, μ = 1.25 cm⁻¹) Undergraduate

Lead x (mm)Predicted net rate (cps)Measured net rate (cps)Fraction of unshielded
080.080.11.00
5.540.240.50.50
11.020.219.90.25
16.510.210.30.13
22.05.15.20.06

HVL = 0.693/1.25 = 0.554 cm. Each 5.5 mm of lead halved the count rate, as predicted.

Table D: Foil Thickness Gauge (μ = 17.8 cm⁻¹, R₀ = 4000.6 cps gross) Undergraduate

SheetR gross (cps)x = ln[(R₀ − 0.5)/(R − 0.5)]/μ (mm)Decision (0.50 ± 0.05 mm)
11642.90.500Accept
21796.00.450Accept (at limit)
31476.70.560Reject
41701.20.480Accept
51520.40.544Accept

Table E: Radiography Boundary (Ir-192, Γ = 0.13 mSv·m²/(h·GBq), HVL Pb = 0.48 cm) Undergraduate

A (GBq)Lead (mm)Boundary r (m)Worker d (m)t (min)Worker dose (mSv)
18500109.72550.032
18509.654.82550.0080
925077.52550.016
18500109.75050.0080

Sample calculation, row 1: Ḋ(1 m) = 0.13 × 1850 = 240.5 mSv/h; r = √(240.5/0.020) = 109.7 m. At 25 m, Ḋ = 240.5/625 = 0.385 mSv/h, so 5 min gives 0.032 mSv.

Table F: Radiography Boundary Planning (Graph: Boundary Distance) Upper undergraduateGraduate step

A (GBq)Collimator (mm Pb)Boundary, bare (m)Boundary, collimated (m)Dose rate at 50 m (mSv/h)
18500.0109.7109.70.0962
18504.8109.777.50.0481
18509.6109.754.80.0240
185014.4109.738.80.0120
29609.6138.769.40.0385
11109.684.942.50.0144

Graduate step: with broad-beam build-up (B = 1.20, 1.35 and 1.48 for 4.8, 9.6 and 14.4 mm) the collimated boundary at 1850 GBq becomes 84.9, 63.7 and 47.2 m instead of 77.5, 54.8 and 38.8 m; at 9.6 mm it is 80.6 m for 2960 GBq and 49.3 m for 1110 GBq.

r = √(ΓA·T/0.020), T = 0.5^(x/4.8 mm). Include a screenshot of the dose-rate graph with the boundary marked.

Table G: Ir-192 Source Decay (Graph: Source Decay) Upper undergraduateGraduate step

A₀ (GBq)DaysActivity (GBq)t₀ (min)Exposure time (min)Days to 370 GBq
185001850.033.00171.4
1850301395.933.98171.4
185074923.536.01171.4
1850120599.639.26171.4
1850180341.4316.26171.4
1850240194.4328.56171.4

Graduate step: averaging t₀·2^(t/73.83) from calibration to 370 GBq gives t_avg = t₀ × 73.83/(ln2 × D) × (A₀/370 − 1): 7.46 min for 1850 GBq (D = 171.4 d) and 10.10 min for 2960 GBq (D = 221.5 d), with t₀ = 3.0 min.

A = A₀ × 0.5^(t/73.83 d); t = t₀ × A₀/A. A 1850 GBq source reaches the 370 GBq replacement level after 171.4 days.

Discussion

The background was steady at about 0.5 cps, and the scatter between repeated counts matched σ = √N, confirming the counter was working correctly. The Cs-137 net rate fell as 1/r², and each 5.5 mm of lead halved it, in agreement with μ = 1.25 cm⁻¹. The penetration test showed the expected pattern: paper stopped alpha, a few millimetres of aluminum stopped beta, and gamma rays were only reduced, even by lead. Aluminum is preferred for beta shielding because a high atomic number material such as lead turns more of the beta energy into bremsstrahlung X-rays.

The foil gauge converted count rates to thickness with a statistical uncertainty of about 0.005 mm, more than enough to sort sheets against a ±0.05 mm specification. In the radiography job, two half-value layers of lead (9.6 mm) cut the boundary radius in half, and doubling the radiographer's distance cut the radiographer's dose by a factor of four, showing how shielding, distance, and time together keep both the public and the crew within limits.

The graphs turned these results into job-planning tools. On the log–log dose-rate graph each collimator thickness gave a parallel straight line, and every half-value layer moved the boundary inward by a factor of √2: from 109.7 m bare to 77.5, 54.8 and 38.8 m for one, two and three HVLs at 1850 GBq. The decay curve showed why the exposure time must be updated on every job: four months after calibration the source had fallen to 600 GBq and each film needed 9.3 min instead of 3 min. The radiographer also gains from the decay, because the same boundary rule now gives a smaller roped area.

The graduate steps showed where the simple models fall short. Narrow-beam attenuation underestimated the dose behind the collimator: with build-up the 9.6 mm boundary moved from 54.8 m to 63.7 m, so a rope set from the half-value layer alone would leave the public above 0.020 mSv/h. Averaged over its working life, a 1850 GBq source needed 7.46 min per film, about 2.5 times the fresh-source time; a larger 2960 GBq source lasts longer but its average time rises to 10.1 min, which adds crew time near the camera and must be weighed in the ALARA plan.

Conclusion

The counting system obeyed Poisson statistics, gamma intensity followed the inverse-square law and exponential attenuation with an HVL of 0.55 cm of lead, and the three radiation types showed their characteristic penetration. These principles allowed accurate thickness measurement on a production line and a correctly placed radiography boundary of 109.7 m for an unshielded 1850 GBq Ir-192 source.

Practice Questions

Show all work and include units. Use the equations and data in the Theory section.

Question 1
A technician wants the relative uncertainty of a count to be no more than 1%. What is the minimum number of counts she must collect?
Hint: relative uncertainty = 1/√N.
Question 2
A survey meter reads 0.80 mSv/h at 2.0 m from a small gamma source. At what distance will it read 0.020 mSv/h?
Hint: rearrange I₂ = I₁(r₁/r₂)² for r₂.
Question 3
How many half-value layers of lead are needed to reduce a gamma dose rate by a factor of 100? What thickness of lead is this for Cs-137 (HVL = 0.55 cm)?
Hint: solve (1/2)ⁿ = 1/100, so n = log(100)/log(2).
Question 4
A level gauge on a filling line uses Cs-137 (half-life 30.1 years). By what percentage has its count rate fallen five years after the last calibration, and why must it be recalibrated?
Hint: A/A₀ = (1/2)^(t/t½).
Question 5
An Ir-192 source of 1500 GBq was installed 147.6 days ago. What is its activity now, and what is the new unshielded boundary radius for 0.020 mSv/h?
Hint: 147.6 days is two half-lives of Ir-192; then use r = √(ΓA/0.020).
Question 6: Challenge
A radiographer must work at the crank, 20 m from an unshielded 1850 GBq Ir-192 source, for a total of 12 minutes per day. Her administrative limit is 0.10 mSv per day. Is she within the limit? If not, suggest two practical changes and show by calculation that one of them works.
Hint: find Ḋ at 20 m, multiply by the time in hours, then try a longer guide tube or a collimator.