Virginia Research Institute
Virginia Research Institute
Virtual Laboratory  ·  Built by E2 Innovations
← Back to Virtual Labs|Control Rod Worth Curves and Shutdown Margin
Nuclear Engineering Technology · Reactor Control and Technical Specifications

Control Rod Worth Curves and Shutdown Margin

Work as a reactor engineer verifying that the reactor can always be shut down. Move a control bank through the core while a reactivity computer measures its worth, and work out the integral and differential rod worth from the bank's S-shaped worth curve. Then perform a shutdown margin calculation the way plant engineers do before every startup: the worth of all rods with the most reactive rod stuck out, the 10% uncertainty, the power defect and rod insertion allowance, the shutdown margin, and the k-eff the reactor reaches after a trip. Two graph work areas then show the same physics the way reactor engineers use it: the integral and differential worth curves plotted together, and the shutdown margin tracked across the whole fuel cycle against the technical specification limit. In every part you work out the answer yourself, then check it.

Theory: Rod Worth and Shutdown Margin

Why Shutdown Margin Matters

The most basic safety function of a reactor is to shut down and stay shut down. Every reactor's technical specifications therefore require a minimum shutdown margin (SDM): the amount by which the core would be subcritical if all control rods dropped in, assuming the single most reactive rod stuck fully out. Reactor engineers measure rod worths during startup physics testing and recalculate the SDM before every startup and whenever conditions change. If the SDM is too small, the operators must add boron until it is restored.

Integral and Differential Rod Worth

A rod's effect depends on the neutron flux where its absorber sits, and the flux is largest in the middle of the core. Moving a rod near the top or bottom changes reactivity very little; moving it through the middle changes it most. The differential worth (pcm per step) is therefore bell-shaped, and the integral worth (the total reactivity withdrawn so far) is S-shaped. Worths are measured with a reactivity computer during startup physics tests, by boron dilution, rod swap, or dynamic rod-drop methods.

S-Curve Model of a Control Bank (x = z/H) Integral worth withdrawn: ρ(z) = W [x − sin(2πx)/(2π)]
Differential worth: dρ/dz = (W/H)(1 − cos 2πx)
Maximum differential worth: 2W/H at mid-core
Half the bank worth lies in the middle third of its travel

Calculating the Shutdown Margin

After a trip from full power, all rods drop in. As the core cools from operating temperature to hot zero power, the power defect from the feedback lab comes back as positive reactivity and must be overcome. A rod insertion allowance accounts for the control banks already being partly inserted at power. The rod worth is reduced by the most reactive stuck rod (the N − 1 assumption) and by a 10% allowance for calculation uncertainty.

Shutdown Margin (standard PWR method) N − 1 worth = total rod worth − most reactive stuck rod
SDM = 0.90 × (N − 1 worth) − (power defect + rod insertion allowance)
After the trip: ρ = −SDM, k-eff = 1/(1 + SDM × 10⁻⁵)
Technical specification: SDM ≥ 1300 pcm (1.3% Δk/k)

The SDM is smallest at end of cycle, when the power defect is largest because the moderator temperature coefficient is most negative. This is why end-of-cycle conditions usually limit the design.

Data Used in This Lab

QuantityValueQuantityValue
Bank D total worth1100 pcmBank D length228 steps
Total worth of all rods6000 to 7000 pcmMost reactive stuck rod600 to 1500 pcm
Power defect, BOC / EOC2009 / 2573 pcmUncertainty allowance10%
Rod insertion allowance0 to 800 pcmSDM limit1300 pcm

The method follows standard Westinghouse-type PWR practice as described in the DOE Fundamentals Handbook (Reactor Theory: Control Rods) and plant core operating limits reports; the numbers are representative. Real SDM calculations include further allowances, such as for xenon and void effects.

Reactor engineering

Engineers compute SDM before each startup and after any rod found inoperable.

Startup physics tests

After refuelling, bank worths are measured and compared with predictions to confirm the core model.

Operations

Rod insertion limits keep enough rod worth available for a trip at every power level.

Reading Worth Curves and Cycle Graphs

The differential worth is the slope of the integral worth curve, so the steepest part of the S-curve is where the differential curve peaks. The average differential worth between two positions is the slope of the straight chord joining them. Core designers also plot the shutdown margin against burnup for each cycle. Because the power defect grows as the moderator temperature coefficient becomes more negative, the margin usually falls through the cycle and is smallest at the end, which is where the design is checked against the limit.

Apparatus

The plant hardware and tools used for rod worth and shutdown margin. In the simulation these are modelled for you, and the readings correspond to what each would show.

Rod cluster control assembly
24 absorber rods on a spider, moved together by one drive mechanism.
+266.8 pcm
Reactivity computer
Solves the kinetics equations in real time from neutron detector signals to display reactivity.
Rod position indication
Step counters and digital rod position indication show where every bank and rod is.
Core rod map
Shows every rod location; the most reactive rod is identified for the N − 1 calculation.
ppm B
Boron sampling
If SDM is too low, the operators borate the coolant and chemistry confirms the new concentration.
SDM
SDM worksheet
The surveillance procedure that documents each shutdown margin calculation.

Instructions: Running the Virtual Experiment

You are the reactor engineer performing startup physics checks. The simulation has two immersive 3D work areas and two graph work areas. The parts build from undergraduate work in Parts A and B to graduate-level analysis in the last step of Parts C and D; the level of each part is shown beside its title. In each one you set the conditions, work out the answer yourself, enter it, and press Check. Record every reading and calculation in your lab report tables (modelled in the Example Report), with a labelled screenshot of each setup. Drag in any 3D view to orbit, and scroll to zoom.

Part A: Rod Worth Curves (3D Rod Worth Measurement)Undergraduate
1
Open Simulation → 3D Rod Worth Measurement. Set z₁ = 100 and z₂ = 128. Choose Predict: worth of moving from z₁ to z₂, calculate it from the S-curve, and check it. Press Move bank and measure and compare the reactivity computer reading.
2
Check the differential worth at z₂ and the maximum differential worth. Press Record this run.
3
Measure the worth for moves of 0 → 40, 0 → 114, 180 → 228, and 0 → 228. Record them in Table A and sketch both worth curves. Explain why the bottom and top 40 steps are worth so little.
Part B: Shutdown Margin (3D Shutdown Margin)Undergraduate
1
Open 3D Shutdown Margin. Choose End of cycle, total worth 6500 pcm, stuck rod 1000 pcm, and insertion allowance 500 pcm. Check the N − 1 worth and the worth after the 10% uncertainty.
2
Check the reactivity to be overcome, the shutdown margin, and the k-eff after the trip. Decide whether the 1300 pcm limit is met. Press Record this run.
3
Repeat at beginning of cycle, and then at end of cycle with total worth 6000 pcm and a 1200 pcm stuck rod. Record all runs in Table B and say what the operators must do when the limit is not met.
Part C: Integral and Differential Worth Curves (Graph: Rod Worth Curves)Upper undergraduateGraduate step
1
Open Graph: Rod Worth Curves. Set z₁ = 60 and z₂ = 170. Check the share of the total bank worth between the two positions and the average differential worth (the slope of the chord). Press Record this run.
2
Repeat for 0 → 40, 90 → 138, 180 → 228, and 0 → 228. Record all runs in Table C.
3
Read the peak of the dashed curve and check the position of the largest differential worth. Compare the slope of the integral curve there with the dashed curve's height. Take a labelled screenshot of the graph for your report.
4
GraduateRod position indication is only good to about ±2 steps at each end of a move. For 60 → 170 and 90 → 138, check the uncertainty in the worth by propagating the two independent position errors through the differential worth. Record it in the last column of Table C and explain why moves near mid-core are the least certain.
Part D: Shutdown Margin across the Cycle (Graph: SDM over the Cycle)Upper undergraduateGraduate step
1
Open Graph: SDM over the Cycle. Choose total worth 6000 pcm, stuck rod 1200 pcm, and burnup 9 GWd/tU. Check the shutdown margin at this burnup, the smallest margin in the cycle, and the burnup at which the margin falls to 1300 pcm. Press Record this run.
2
Repeat with 6500 pcm / 1000 pcm and 6000 pcm / 1300 pcm at 9 GWd/tU. For a case that never reaches 1300 pcm, record "none". Record all runs in Table D.
3
Explain from the graph why the end of the cycle is the limiting point, and what the core designer or the operators must do when the line crosses the limit before the end of the cycle.
4
GraduateAct as the core designer. For stuck rods of 1200, 1000, and 1300 pcm, check the smallest total rod worth that keeps the margin at 1300 pcm to the end of the cycle. Record it in the last column of Table D and compare it with the worth you chose.

Simulation: Rod Worth, Shutdown Margin, and Cycle Graphs

Rod Worth and Shutdown Margin Virtual LabSet up the equipment, work out your answer, then Check

Control bank D is worth 1100 pcm in total over 228 steps. Its integral worth follows an S-shaped curve because the flux, and so the rods' effect, is greatest in the middle of the core. Step 0 is fully inserted; step 228 is fully withdrawn. Part A uses this work area.

Drag to orbit · scroll to zoom. 3D core with control bank D: the rod cluster moves between the two positions you set, and the reactivity computer board plots the bank's integral worth curve with each measured point.

Setup

Readings

Total bank worth W—
Bank length H—
Reactivity computer: measured worth of last move—

Integral worth withdrawn up to position z: ρ(z) = W [x − sin(2πx)/(2π)], x = z/H. Differential worth: dρ/dz = (W/H)(1 − cos 2πx).

Work it out, then check

Table A: your rod worth record
z₁z₂Predicted worth (pcm)Measured worth (pcm)Differential worth at z₂ (pcm/step)

Technical specifications require the reactor to be at least 1300 pcm subcritical after a trip from full power, even if the most reactive rod sticks out. Part B uses this work area.

Drag to orbit · scroll to zoom. 3D core map seen from above: every control rod cluster drops into the core except the most reactive one, which stays stuck out (red). The gauge shows the shutdown margin against the 1300 pcm technical specification limit.

Setup

Readings

Power defect (from the Reactivity Feedback lab)—
Uncertainty allowance on rod worth—
Technical specification limit—
Status—

SDM = 0.90 × (total worth − stuck rod worth) − (power defect + rod insertion allowance).

Work it out, then check

Table B: your shutdown margin record
CycleTotal (pcm)Stuck (pcm)N − 1 (pcm)× 0.90 (pcm)Required (pcm)SDM (pcm)Meets 1300?k-eff

The integral worth curve tells you how much reactivity a move adds; its slope, the differential worth, tells you how sensitive the reactor is to each step. Plotting both together shows where the bank is most effective. Part C uses this work area.

Integral worth of bank D (solid) and its differential worth × 100 (dashed) against bank position. The two dots mark the positions you chose, and the straight chord between them has a slope equal to the average differential worth.

Show the plotted values

Setup

Readings

Bank D total worth W—
Bank length H—
Worth between the positions—

ρ(z) = W[x − sin(2πx)/(2π)], dρ/dz = (W/H)(1 − cos 2πx), x = z/H.

Work it out, then check

Table C: your rod-worth graph record
z₁z₂Worth (pcm)Share of W (%)Average dρ/dz (pcm/step)Graduate: σ (pcm)

The shutdown margin changes through the cycle because the power defect grows as the moderator temperature coefficient becomes more negative. Tracking it on a graph shows when, if ever, the margin reaches the technical specification limit. Part D uses this work area.

Shutdown margin against cycle burnup for the rod worths you chose, with the 1300 pcm technical specification limit (red dashed line). The dot marks the burnup you selected.

Show the plotted values

Setup

Readings

Power defect—
Rod insertion allowance—
Technical specification limit—

Power defect rises linearly from 2009 pcm (0 GWd/tU) to 2573 pcm (18 GWd/tU). Rod worths are held at their design values. Simplified training model.

Work it out, then check

Table D: your cycle shutdown-margin record
Total (pcm)Stuck (pcm)Burnup (GWd/tU)SDM (pcm)Smallest SDM (pcm)Burnup at 1300 pcmGraduate: T_min (pcm)

These immersive 3D work areas and interactive graph work areas are the main version; the accessible copy delivers the same set-up, work-out, and check exercises with native controls and screen-reader announcements.

Team Questions

Question 1. A 1100 pcm bank, 228 steps long, follows the S-curve. What worth is withdrawn when the bank moves from 0 to 114 steps, in pcm?
Question 2. What is the worth of moving that bank from 100 to 128 steps, in pcm?
Question 3. What is the maximum differential worth of that bank, in pcm per step?
Question 4. All rods together are worth 6500 pcm, and the most reactive rod is worth 1000 pcm. What is the N − 1 rod worth, in pcm?
Question 5. What is that worth after the 10% uncertainty allowance, in pcm?
Question 6. At end of cycle the power defect is 2573 pcm and the rod insertion allowance is 500 pcm. What is the shutdown margin, in pcm?
Question 7: Challenge. With that shutdown margin, what is k-eff after the reactor trips?

Example Lab Report

Sample report showing the expected format and level of detail. Use it as a guide for your own submission, and include labelled screenshots of each setup. Your reactivity-computer readings will differ by about 1%.

Control Rod Worth Curves and Shutdown Margin

Nuclear Engineering Technology | Section: [Your Section] | Date: [Date]

Lab Members: [Names of all members present]

Purpose

To predict and measure the integral and differential worth of a control bank, and to calculate the shutdown margin at beginning and end of cycle for different rod worths, checking it against the 1300 pcm technical specification limit, and to use worth-curve and cycle graphs to find where rods are most effective and when the margin is smallest.

Theory

Bank integral worth follows ρ(z) = W[x − sin(2πx)/(2π)] and differential worth (W/H)(1 − cos 2πx). SDM = 0.90(total − stuck) − (power defect + rod insertion allowance), and k after a trip is 1/(1 + SDM × 10⁻⁵).

ρ(z) = W[x − sin(2πx)/2π]  ·  SDM = 0.90(N − 1) − (PD + RIA)  ·  k = 1/(1 + SDM)

Table A: Bank D Worth (W = 1100 pcm, H = 228 steps) Undergraduate

z₁z₂Predicted (pcm)Measured (pcm)dρ/dz at z₂ (pcm/step)
04036.837.12.646
0114550.0546.29.649
100128266.8268.99.294
18022861.961.40.000
02281100.01104.60.000

Sample calculation (100 → 128): ρ(128) = 1100[0.5614 − sin(3.5274)/(2π)] = 683.4 pcm; ρ(100) = 416.6 pcm; difference 266.8 pcm. Maximum differential worth = 2 × 1100/228 = 9.65 pcm/step at step 114.

Table B: Shutdown Margin Undergraduate

CycleTotal (pcm)Stuck (pcm)N − 1× 0.90RequiredSDM (pcm)Meets 1300?k-eff
BOC650010005500495025092441yes0.97617
EOC650010005500495030731877yes0.98158
EOC600012004800432030731247no0.98768

Table C: Rod Worth Curves (W = 1100 pcm, H = 228 steps) Upper undergraduateGraduate step

z₁z₂Worth (pcm)Share of W (%)Average dρ/dz (pcm/step)Graduate: σ (pcm)
60170880.280.08.002±14.4
04036.83.30.919±5.3
90138446.640.69.305±24.4
18022861.95.61.289±7.3
02281100.0100.04.825±0.0

Largest differential worth read from the graph: step 114 (9.65 pcm/step). Graduate: σ = √[(2 × 5.223)² + (2 × 4.957)²] = ±14.4 pcm for 60 → 170; the ends of travel (0 and 228) have zero differential worth, so a full withdrawal has no position uncertainty. Include a screenshot of the worth curves with your chord.

Table D: Shutdown Margin across the Cycle (power defect 2009 → 2573 pcm, allowance 500 pcm) Upper undergraduateGraduate step

Total (pcm)Stuck (pcm)Burnup (GWd/tU)SDM (pcm)Smallest SDM (pcm)Burnup at 1300 pcmGraduate: T_min (pcm)
6000120091529124716.36059
65001000921591877none5859
6000130091439115713.46159

Sample (6000/1200): SDM at 0 GWd/tU = 4320 − 2509 = 1811 pcm; at 18 GWd/tU = 1247 pcm; crossing at (1811 − 1300)/(1811 − 1247) × 18 = 16.3 GWd/tU. Graduate: T_min = 1200 + (1300 + 3073)/0.90 = 6059 pcm, so 6000 pcm falls 59 pcm short.

Discussion

The measured worths matched the S-curve within the reactivity computer's 1.5% scatter. The first and last 40 steps of travel together held only about 74 pcm of the bank's 1100 pcm, while the 28 steps around mid-core held 267 pcm, because the flux, and so the absorption, peaks in the middle of the core. This is why rod insertion limits keep control banks out of the bottom of the core at power, and why the differential worth must be known when using rods for fine control.

The SDM was 2441 pcm at beginning of cycle but only 1877 pcm at end of cycle, because the larger power defect returns more reactivity as the core cools after a trip. With weaker rods and a more reactive stuck rod, the end-of-cycle SDM fell to 1247 pcm, below the 1300 pcm limit. The technical specifications would then require the operators to start emergency boration within 15 minutes and continue until the margin is restored.

The graphs made both results easy to see. The middle 110 steps of the bank (60 to 170) held 80% of its worth, and the chord slope there (8.0 pcm/step) was nine times the slope over the bottom 40 steps. The differential curve peaked at step 114, exactly where the integral curve is steepest. On the cycle graph the margin fell in a straight line as the power defect grew, so the end of the cycle was always the limiting point. With 6000 pcm of rods and a 1200 pcm stuck rod, the line crossed the 1300 pcm limit at 16.3 GWd/tU, so the core design would need more rod worth, or the plant would need a higher boron concentration for shutdown, before the last 1.7 GWd/tU of the cycle.

The graduate steps turned the graphs into engineering judgements. Propagating a ±2-step position error gave ±24 pcm for a 48-step move across mid-core but only ±5 pcm for the bottom 40 steps, so worth measurements and rod-swap calibrations are least certain exactly where the bank is most effective. Solving the end-of-cycle margin for the rod worth showed that every 100 pcm added to the stuck rod raises the required total worth by 100 pcm, and that 6000 pcm of rods needs a stuck rod of no more than 1141 pcm; the 1200 pcm case missed by 59 pcm, which is why the designer either strengthens the bank or loads the core so that the most reactive rod sits in a lower-flux location.

Conclusion

Rod worth is concentrated near mid-core, following an S-shaped integral curve. The shutdown margin is smallest at end of cycle, and the N − 1 and 10% allowances make the calculation conservative.

Practice Questions

Show all work and include units.

Question 1
Show that half of the bank's worth lies between steps 57 and 171.
Hint: evaluate ρ(171) − ρ(57).
Question 2
An operator wants to add 10 pcm with bank D near step 114. How many steps should the bank be withdrawn?
Hint: use the differential worth.
Question 3
Why is the N − 1 assumption (one rod stuck out) required, and why is it the most reactive rod that is assumed stuck?
Hint: single-failure criterion.
Question 4
With EOC conditions, 6000 pcm total worth, and a 1200 pcm stuck rod, how much boron must be added to restore a 1300 pcm SDM if boron worth is −10 pcm/ppm?
Hint: find the shortfall first.
Question 5
Explain why the power defect is part of the reactivity to be overcome after a trip.
Hint: what happens to the fuel and moderator temperatures after the trip?
Question 6: Challenge
Using the Xenon lab, describe how xenon after a trip affects the shutdown margin over the next 72 hours, and why SDM calculations conservatively ignore the xenon peak.
Hint: xenon first adds, then removes, negative reactivity.
© 2026 E2 Innovations LLC / Virginia Research Institute. All rights reserved. Licensed for use on E2 Innovations and VRI sites only — not for redistribution or reuse in other courses. Contact info@e2innovations.ai.